To apply for a building permit, we require:
- Complete Building Permit Application Form
- Two sets of building drawings
- New dwellings in residential areas require a site and grading plan by a land surveyor or engineer
- Accessory structures require a property site plan
- Some projects may require the approval of other agencies such as but not limited to: Saugeen Valley Conservation Authority, Ministry of Transportation
- Multi-unit residential, commercial, industrial etc. are subject to site plan control
Application Timeline
When a complete application is received our staff review and communicate with the applicant as per the Ontario Building Code Act timelines:
- 10 business days for residential building permit application
- 15 business days for a small commercial building permit application
30 business days for a large commercial building permit application
Projects Requiring a Permit
Before you start construction of any type, please contact the Building Department.
Some projects that require a permit include (but are not limited to):
- Build a new building or structure (greater than 108ft2)
- Build any addition or make structural changes
- Renovations or repairs to existing buildings
- Build a deck
- Finish an unfinished basement
- Add or change size of doors or windows
- Create a new entrance
- Wood burning stove or fireplace
- Plumbing
- Adding a washroom or altering existing plumbing
- Septic
- New insulation
- Connect to municipal water
- Demolish a house or building greater than 108 square feet. A form 357 is required after demolition and is to be submitted to the Treasury Department.
- Before demolition it is your responsibility to contact the Water Department and your hydro provider (Hydro One or Westario)
- Change the use of a building
- Installing a swimming pool
Projects Not Requiring a Permit
Some projects that do not require a permit include:
- replacing existing doors and windows (same size)
- Install siding on small residential buildings
- Roofless deck that has an area of less than 108 ft2and the maximum height off the ground is under 0.61 m (2 ft)
- Accessory building that square footage is less than 108 ft2 (i.e. garden shed)
- Must be in a side or rear yard; minimum setback 1m from property lines
- Re-shingle roof
- Dry-wall or plaster
- Paint or decorate
- Install kitchen or bathroom cupboards
- Install fence on your own property (call the Building Department if you are on a corner lot)